TEST
Before selecting Paramount Metal Systems as the design-build firm for the retrofit, André Desjarlais, group leader for Building Envelopes Research, ORNL, established the minimum R-values requirements, moisture migration targets, and an overall goal of exceeding current code requirements of the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE). One of the challenges Paramount and ORNL faced was there weren’t any physical, provable metal building retrofit projects that they could test for retrofitting performance. “As a result, a highly-skilled team was commissioned to design a demonstrable project used to display the measurable benefits of various cool roofing technologies and framing systems,” said David Dodge, president of Paramount Metal Systems. “ORNL wanted a high-quality retrofit job with proven solutions. We selected Dow Building Solutions based on its quality products and building science experience and know-how.”